Meta’s $10 billion Anthropic projection is the bill for a failed talent raid, and Muse Code is the exit ramp.
Eight days after Boston Scientific found a cyberattack, hospitals can still place orders but cannot get stents, pacemakers or new home monitors shipped.
Alphabet already puts 60 cents of each infrastructure dollar into servers, so a 15% Nvidia system hike in 2027 will lift capex and cloud prices.
OpenAI’s Jalapeño chip posts 1.5 to 1.9 times more inference work per watt, aiming at agent delay and capped power rather than a full Nvidia exit.
Pere Marquette Township froze data centers for a year with no speakers at the hearing, joining dozens of Michigan pauses beside a Lake Michigan power plant.